Decorating Work on Church and Clock Tower
This is a medium size job we have erected for decorating works to the church and the clock tower
- The scaffolding has been erected to the full perimeter of the church and erected in three fully boarded scaffold lifts.
- The scaffolding to the main access has been fully netted.
- The scaffolding has been erected for decorating works only
- The scaffold has been erected on the pavement and all permits have been obtain by our selves.
All of the scaffolding has been erected and designed in accordance with TG;20;13